🚧Draft previewConstruction Site Safety
Make my construction site safer
Recommended emergency assets for construction sites and active building projects
Who this helps: Construction site supervisors, workers, and safety officers on active building projects
This is a friendly planning guide — not production signage yet. Use it to decide what to print, post, and practice in construction site safety.
- 1Install assembly point sign at site entrance
- 2Post 112 and site medic numbers at every gate
- 3Label first-aid kit and fire extinguisher locations
2 more quick wins
- Brief all workers on muster point location
- Run a 10-minute muster drill this week
PosterA3
Severe Bleeding — Direct Pressure Poster
Best placed: First aid area, Factory floor
PosterA3
Fire Evacuation — Home Poster
Best placed: Home hallway, Apartment corridor
PosterA4
Electrical Emergency — Do NOT Touch
Best placed: Electrical room, Factory
SignA4
Emergency Numbers Sign
Best placed: Building entrance, Reception
SignA3
Emergency Assembly Point Sign
Best placed: Building courtyard, Playground
SignA4
Fire Extinguisher Location Sign
Best placed: Corridor, Kitchen
SignA4
First Aid Kit Location Sign
Best placed: First aid room, Office corridor
CardPOCKET
Emergency Action Quick Reference Card
Best placed: Wallet, Glove box
ChecklistA5
Post-Earthquake Safety Checklist
Best placed: Building entrance, Disaster shelter
- First aid area
- Factory floor
- Workshop
- Kitchen
- Home hallway
- Apartment corridor
- Stairwell
- Building entrance
- Electrical room
- Factory
- Construction site
- Utility area
- Trench collapse — mark danger, call 112, no entry
- Fall from scaffold — do not move, stabilize scene
- Fire on site — evacuate to muster point
- Crane or heavy equipment emergency shutdown drill